| subdivision drafting in Perth - Domestic Drafting Service |
Some Perth property owners sit on
blocks large enough to subdivide and still have room to build. It sounds like a
straightforward way to make better use of land, and in many cases it is. But
the two processes don't always run as neatly in parallel as people expect.
Can You Actually Do Both at The Same
Time?
Yes, but with conditions. Subdivision
and development approval are separate processes in WA, managed by different
authorities. Subdivision goes through the Western Australian Planning
Commission (WAPC), while development approval for any new dwelling sits with
the local council.
You can lodge both applications
concurrently, but approval of one doesn't guarantee the other. A block might
get subdivision approval and still face issues with the proposed build due to
setbacks, site coverage or access requirements on the newly created lot.
What Determines Whether Your Block Can
Be Subdivided?
The starting point is your zoning under
the local planning scheme. In Perth, the R-Code zoning on your property sets
the minimum lot size for each new lot created. Common examples:
- R20 zoning: minimum 350sqm per lot
(average 400sqm)
- R25 zoning: minimum 300sqm per lot
- R40 zoning: minimum 180sqm per
lot, which opens up more options on mid-sized blocks
A surveyor confirms the lot dimensions,
but subdivision drafting in Perth
professionals prepare the plans that go to WAPC showing how the land will be
divided, where boundaries sit, and how each lot will access the street.
The Sequencing Question
Most owners want to know: do you
subdivide first, then build, or can you build while subdivision is being
processed?
|
Approach |
What It Means |
|
Subdivide first,
then build |
Cleaner title
structure, simpler financing on the new lot |
|
Concurrent
lodgement |
Saves time but
requires careful coordination between approvals |
|
Build first, then
subdivide |
Possible but can
create complications with existing structures on proposed lot boundaries |
The most common issue with concurrent
applications is that the subdivision plan and the development drawings need to
be consistent. If they show different boundary positions or access points, one
or both applications will need to be amended. That back-and-forth adds weeks.
What the Drafting Process Actually
Involves
The Subdivision plans in Perth
need to show more than just a line through the middle of a block. WAPC
requires:
- Proposed lot boundaries with
dimensions and areas
- Existing structures and how they
relate to new boundaries
- Easements, rights of way and
service connections
- Street access for each new lot
Getting these details right the first
time matters. A plan that doesn't account for an existing shed sitting too
close to a proposed boundary, for example, will come back with conditions that
need resolving before titles can be issued.
Working Out the Build Feasibility Early
Before committing to either
application, it's worth checking whether the new lot can actually support the
build you have in mind. A subdivision draftsman in Perth
can overlay a proposed dwelling footprint onto the subdivision plan to test
whether setbacks, open space requirements and vehicle access all work before
anything is lodged.
Planning Your Subdivision and Build
with Domestic Drafting Service
Domestic Drafting Service prepares
subdivision and residential drafting documentation for Perth property owners
working through both processes. They coordinate the documentation across
subdivision and development applications, helping to keep both on track without
the usual back-and-forth between separate consultants.